NEL expects FID on GW of H2 by 2025
11 May 2023Johnson Matthey, Hystar partner in green H2
22 May 2023Austria’s first green hydrogen production site has commenced operations in Styria, marking the beginning of a comprehensive plan to expand the electrolysis capacity in the mountainous province to over 150 MW in an initial push.
The pilot plant located in the Gabersdorf municipality features a 1-MW electrolyser powered by a nearby solar park with a collector area of 6,000 sq m (7,176 sq yd). When fully expanded, the site is expected to produce 300 tonnes of renewable hydrogen annually.
The first off-taker of the output is industrial company Wolfram Bergbau und Huetten AG, a subsidiary of Sandvik Group, which will procure 70 tonnes of the output to reduce the use of natural gas at its metallurgical plant in St. Martin im Sulmtal, Styria.