
Sunfire unveils 50-MW electrolyser module
15 April 2026
Armstrong Industrial Partners With Hystar to Deliver Modular Hydrogen Plants From 1MW to 20MW
16 April 2026UK technology licensor Ceres has launched a new 10.8kW solid oxide stack, which it believes could meet growing demand for on-site data centre power and cut green hydrogen production costs.
The Endura stack is based on Ceres’ steel substrate-based solid oxide cells, which operate at 450–630ºC. It can be used for both power generation in fuel cell configurations and hydrogen production in electrolysis setups.

